At your location in just 29 minutesGet the measurements right away.T&C

Shower Cubicles design available in Kharadi, Pune

Kharadi · Pune

Shower Glass Partitions & Cubicles in Kharadi

First fittings in Kharadi's newly handed-over towers, timed to the tiling.

₹675/ sq ft starting price

Before GST. Firm price after we measure your site.

  • Building access handled
  • 2-year product warranty, 6 months on the work
  • Fitted by our own team. We never subcontract.

Most of Kharadi's towers are new, and many flats come to us just after handover. The bathroom has never had a shower enclosure. The walls are straight and the tiles are new. The one question that matters is timing. We measure after the tiling and the floor are finished, and we fit before you move in.

Measuring a Kharadi flat after handover

A handed-over flat often has a builder-finished bathroom, and many owners re-tile or change the fittings before moving in. The glass must wait for that.

We measure once the tiles are fixed and grouted and the floor is finished. The glass is cut to those faces. Toughened glass cannot be cut again after it is made.

If you are keeping the builder's tiles, we can measure on the day you get the keys. The glass is then ready within a couple of weeks.

Frameless glass for new, straight walls

New walls in a Kharadi tower are usually straight and square. That lets us fit frameless glass, which has no frame to hide anything and nothing to hide.

The fixed panel sits in a slim channel or on clamps. The door hangs on glass-to-glass hinges. We size the glass thickness to the door.

We check the corner with a square anyway. A new wall is not always a straight wall, and it takes a minute to know.

Moving-in week in a new tower

In a new Kharadi tower, many flats are being fitted out at the same time. The service lift is busy and the society's rules are still settling.

We book the lift slot through the facility desk and bring the glass up finished. The fitting is one day. The silicone needs a day to set.

So we fit two days before you move in, if you can tell us the date. The shower is then ready on your first night.

How the job works

  1. Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
  2. We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
  3. We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
  4. You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
  5. We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.

Shower Glass Partitions & Cubicles near Kharadi, Pune

Our own Pune team fits shower glass partitions and bathroom glass partitions in Kharadi. Check your street, your PIN code and our hours here.

We come to
Kharadi, EON IT Park, Chandan Nagar, Vadgaon Sheri, and the streets around them.
Landmarks nearby
Kharadi bypass
PIN code
411014
Part of
East Pune, Pune, Maharashtra
Open today
Yes. We take calls and bookings every day, Monday to Sunday, 9am to 8pm.
Contact number
Call +91 9905833824. Send a photo on WhatsApp.
Home service
Our own Pune team measures and fits at your home or office. There is no shop to visit, and we never pass your job to a subcontractor.

Common questions

We have just got the keys to our Kharadi flat. When should we call about the shower glass?

Now, so we can plan around your tiling. If you are keeping the builder's bathroom, we measure as soon as you have the keys and the glass is ready in a couple of weeks. If you are re-tiling, we measure after the tiles are grouted and the floor is finished. Either way, we fit two days before you move in so the silicone has set by your first night.

Is frameless shower glass right for a new tower bathroom?

Usually yes. The walls in a new tower are straight and square, so there is nothing a frame needs to hide. The fixed panel sits in a slim channel or on clamps, the door hangs on glass-to-glass hinges, and the look is clean. We still check the corner with a square at the visit, because new does not always mean straight.

Can you fit the shower before we move in while the tower is still busy?

Yes. We book the service lift slot through the facility desk and bring the glass up finished, so the fitting itself is one day. We ask for your moving date and fit two days ahead of it. If the lift is heavily booked by other flats fitting out, we take an early slot and work from there.

All 16 shower cubicles in Kharadi, with prices

More we fit and repair in Kharadi

Choose a society, apartment complex or building for location references, work planning and available services. These guides are grouped under our Kharadi service area; confirm the property’s full address and entrance before a visit.

Related pages

Shower Cubicles in Kharadi

Send the size and a photo. Every size is verified on site, you get a firm written price, and asking costs nothing.

  • Toughened safety glass, at the thickness stated in your written quote.
  • The fittings, finish and supplied parts are named before you approve the job.
  • We source the glass and fittings against the specification in your written quote.
  • We check the quality before we leave. Most jobs are done in 3 to 4 days.
  • No hidden fees. GST is shown as its own line on the quote.
  • Your details stay protected and confidential on a secure connection.
  • You get dedicated support after fitting, from the same team every time. They are dependable.
  • Easy and transparent from the first message. We work customer-first, so the job stays hassle-free.
Chat on WhatsApp