A shower enclosure in Kothrud is usually part of a bathroom being redone. The flat is in a settled society off Karve Road or Paud Road. The family lives there while the work goes on. So the job is planned around the tiler, the plumber and the household. We fit the glass last, once the tiles are set and the shower is in. That order matters more here than anywhere else in Pune.
Fitting the glass after the Kothrud tiler has gone
The enclosure sits on the finished floor and against the finished wall. So we measure only after the tiles are laid and the grout is dry. A measurement taken on bare plaster is wrong by the thickness of the tile.
We ask your tiler to finish the shower corner first. That gives us our measurements early. The rest of the bathroom can carry on while the glass is being made.
We also ask where the shower mixer and the drain will sit. The door should open away from the mixer. The drain should sit inside the enclosure, not under the glass line. Both are easy to plan and hard to change later.
Hard water marks and how to keep Kothrud glass clear
Most Kothrud societies run on corporation water, and a few top up from a borewell. Borewell water is hard. It leaves a white film on glass when the drops dry.
We cannot soften your water. But we can make the marks easier to deal with. A protective coating on the glass makes water run off in sheets instead of drops. The glass stays clearer for longer and wipes clean with a soft cloth.
A squeegee kept in the shower does more than any coating. Thirty seconds after each shower keeps the glass as it was fitted. We say this to every Kothrud customer because it saves them a hard scrub later.
Old society stair or Karve Road tower lift
Kothrud has both kinds of building. The older societies have stairs and no lift. The newer towers along Karve Road have a lift, sometimes a service lift.
In a stair building, the stair sets the largest panel we can carry. We measure the turn at the landing on the same visit as the bathroom. If the turn is tight, the fixed panel comes as two pieces with a slim joint.
In a tower, the lift car sets the size. A full-height panel usually fits on the diagonal. We check the car with a tape before the glass is ordered. A panel that does not fit the lift has to climb the stairs, and that changes the plan.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















