Prepare a clear brief for your shop
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Define how the shop stays secure during the repair
State whether the frontage is your responsibility or part of the landlord's premises. Identify the glass panel, door leaf or lock that needs work. Ask how the opening will be protected while the existing part is removed, and distinguish temporary protection from the permanent replacement.
Give the installer the usable delivery route and any limits on trading-hour access. A large pane needs a measured route from unloading to the shop front, not just a measurement of the finished opening. Confirm who moves displays and who approves work that affects a neighbouring unit.
Specify frontage details before ordering
A frontage quotation should identify glass specification, dimensions, edge finish, holes, hardware and the opening direction. Toughened glass cannot be trimmed after processing. Handle and lock positions need agreement before the panel is made. For an existing door, check compatibility with the retained frame and fittings.
Test the closing and locking sequence
At handover, use the door, handle, lock and any adjacent shutter together. Check whether the door clears the floor and nearby displays. Keep the fitting details and care instructions with the invoice so a future replacement can be identified without guessing from a photograph.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.