Prepare a clear brief for your showroom
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Measure the display frontage and its delivery route
Mark fixed glass, moving doors, display units and the space needed to bring products through the entrance. Confirm door swing and clear opening before choosing panel divisions. Measure the route used to deliver the glass as well as the final opening.
Identify any signage, lighting, security contacts or finishes that meet the frontage. Agree which contractor handles each interface. A new panel may require different holes or cut-outs; these must be finalized before toughening rather than adapted on site afterwards.
Check entrance hardware against the actual door
Record the fault and how the door is used. A closer or hinge must be compatible with the door size, weight and arrangement. Ask which existing parts remain and whether the lock and floor clearance will be checked together. A stronger-sounding product name does not establish suitability.
Agree protection and handover around the display
Arrange clearance of stock and a protected work area before installation. Confirm how the frontage will be secured during any interruption. Test movement, closing and locking at handover, and record any outstanding finishing or signage work before the display is reopened.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.
Product guidance to discuss at the survey