At your location in just 29 minutesGet the measurements right away.T&C

Glass Door Hinge Replacement, one of the jobs we do for showrooms

For showrooms · Bengaluru and Delhi NCR

Front Glass, Glass Door & Railing Repairs for Showrooms

We repair the large front glass, tall entrance doors, stair railings and display glass of a showroom, with our own team.

Car and bike showrooms, furniture, tile, lighting and electronics showrooms.

  • Night or Sunday work on request
  • 2-year product warranty, 6 months on the work
  • Professional site manager on every job
Showrooms

Add a photo of the problem

Optional, but it helps us bring the right part.

Free to book. No payment now.

A showroom sells from behind its glass. The front is large, the entrance doors are tall and heavy, and many showrooms have an upper display floor. So a cracked panel or a scraping door is seen by every visitor. We repair all of it in Bengaluru and Delhi NCR.

Our own Fabrockers team does the visit and the work. You get a written price before anything starts. We can work at night or on a Sunday, so the showroom keeps trading.

The work we do for showrooms

Grouped by where it is on your premises. Each job shows its live starting price.

The showroom's large front glass

A cracked front panel is a risk to people walking past. We make broken glass safe the same day. The new panel is toughened safety glass, which cannot be cut after toughening. So we measure, and it is made to that size in a few days. A large panel needs several people and a plan to carry and set.

Tall, heavy showroom entrance doors

A tall glass door is heavy, and its weight sits on a few small parts. Patch fittings are the metal plates that hold a frameless door at its corners. The floor spring, a closer set in the floor, must suit the door's weight. When either wears, the door drops and scrapes. We change the part and set the door straight.

Showroom double doors, handles and locks

Double doors should meet evenly in the middle. When one door drops, a gap opens and the lock stops lining up. We set both doors level, then change the lock or handle if it is worn. A door stopper keeps a heavy door from swinging into the display.

Keeping main road dust out of the showroom display

Many showrooms face a main road, so dust comes in under and around the doors. The rubbers on a glass door edge harden and fall away with time. We fit new rubbers and seal the gaps around the door. The display stays cleaner, and the cooled air stays inside.

Sliding glass doors inside the showroom

Sliding glass doors often close off a manager's cabin, a store room or a delivery area. Grit collects in the bottom track, and the rollers wear flat. Then the door drags or jumps off its track. We clean and repair the track and fit new rollers, usually in one visit.

Glass railings on a showroom mezzanine or stair

An upper display floor usually has a glass railing, and customers lean on it. Clamps are the metal pieces that grip each glass panel. Their rubber pads shrink, and a panel starts to rock. We check every clamp and fixing, and fit new pads or new clamps. A cracked panel is replaced with toughened glass made to size.

Showroom display glass, shelves, table tops and mirrors

Display pieces get chipped when stock is moved around them. We make glass shelves, table tops, counter glass and mirrors to your measured size. Edges are polished, so hands are safe on them. Tell us what the shelf carries, because the load usually decides the thickness.

Office windows on the floor above the showroom

Many showrooms keep an office or a store on the floor above. Those windows get less attention, and they leak or stop closing. We find where the water enters and seal it. We also change worn rollers, so a sliding window moves and shuts fully.

Working around showroom hours

A showroom cannot close its front for a day. So tell us your trading hours when you ask. Our office hours are Monday to Saturday, 9am to 8pm. Businesses can also ask for night or Sunday work. Small repairs, like a floor spring or a handle, usually take one visit. Most larger jobs are done in 3 to 4 days, because the glass is made to size. We can measure during trading and fit after you close. If your showroom sits inside a mall, the mall may set its own work hours. Tell us what they are.

How a large showroom panel gets in

A large panel is heavy and cannot bend. It needs several people, lifting handles that grip the glass, and a clear path. So we look at the route before the glass is ordered. Tell us if there are steps, a ramp, parked vehicles or a display near the front. Stock near the opening usually has to move for a few hours. For an upper floor, we check the stair and any opening the glass can pass through. Sometimes the answer is two smaller panels with a joint. We tell you that before you approve the price.

What we do not do at a showroom

We do not service automatic sensor doors or their motors. We do not repair rolling shutters, signage, lighting or tiling. We do no welding and no new carpentry. On a wooden door we only set the hardware and the alignment. We do fit new shop fronts and glass partitions, and those have their own pages. If you are not sure, send a photo on WhatsApp. We can usually tell you what the job needs, and whether it is ours.

What to send us about a showroom door or panel

A photo or a short video usually tells us most of it. For a door, film it opening and closing, and show the top and bottom corners. For cracked glass, stand back so the whole panel is in the photo. Put a person or a tape measure beside it for scale. Tell us the floor, and how close a vehicle can stop. Then we can bring the right people and parts on the first visit.

Questions showrooms ask us

Can you replace a showroom's front glass without closing the showroom?

Usually, yes. We make the cracked panel safe the same day and measure it. The new toughened glass takes a few days to make. We can then fit it at night or on a Sunday. The area near the panel has to be clear while we work.

Why does our showroom's tall glass door scrape the floor?

A tall door is heavy, and its weight rests on the patch fittings and the floor spring. When one wears or loosens, the door drops a little and scrapes. We check both, change the worn part and set the door level again. This is usually one visit.

Our showroom double doors do not meet in the middle. Can that be set right?

Yes. One door has usually dropped or moved on its pivot. We adjust both doors until the gap between them is even. If a fitting is worn, adjusting will not hold, so we change it. We then check the lock, because it depends on the doors lining up.

Do you repair the glass railing on a showroom mezzanine?

Yes. We check every clamp, base fixing and handrail joint. Loose panels usually need new rubber pads or new clamps. A cracked panel is made safe first, and a new toughened panel is made to size. We can also fit a new glass railing where there is none.

Can you service a showroom's automatic sliding door?

No. We do not service sensor doors or their motors. The company that supplied the motor should do that. We do repair manual sliding glass doors, with their rollers, tracks and locks. We can also replace a cracked fixed glass panel beside an automatic door.

How do you get a large glass panel to an upper showroom floor?

It depends on the building. We look at the stair, the lift and any opening at the front. We measure the route before the glass is ordered. If a full panel cannot pass, we tell you and suggest two panels with a joint. You approve the written price only after that.

Where we do this work

Pick your city, or your area for its own page.

Related pages

Tell us what is wrong at your showroom

Book a visit, or send a photo first. You get a written price before any work starts.

Showrooms

Add a photo of the problem

Optional, but it helps us bring the right part.

Free to book. No payment now.

  • Certified toughened safety glass. It stays safe even if it ever breaks.
  • Genuine branded fittings
  • We buy authentic materials from reputable, established suppliers.
  • We check the quality before we leave. Most jobs are done in 3 to 4 days.
  • No hidden fees. GST is shown as its own line on the quote.
  • Your details stay protected and confidential on a secure connection.
  • You get dedicated support after fitting, from the same team every time. They are dependable.
  • Easy and transparent from the first message. We work customer-first, so the job stays hassle-free.
Chat on WhatsApp