Prepare a clear brief for your mall
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Record the tenant and facilities responsibilities
A tenant shop front, public entrance and common-area railing need separate authorization. Name the person responsible for the asset and the manager approving the work. Include the unit reference and floor. A request from one tenant does not authorize work on the mall's shared property.
Confirm the property's permit process, loading point, service-lift size, permitted work period and waste route. These are questions for the manager, not rules we can infer from the mall's name. Agree the delivery and installation plan before confirming a production date for large panels.
Keep public circulation outside the work zone
State how visitors will reach occupied units while the opening is worked on. Damaged glass or a moving railing needs the affected area isolated. Ask who is responsible for temporary barriers and security. Escalate fire-rated doors, escape routes and automatic entrances for a system-specific assessment.
Close the permit with an itemized handover
List the panels or fittings changed, retained components and any separate finishing work. Check the relevant doors and locks before reopening. For a railing, agree the inspection scope with the responsible professional; replacing a clamp does not by itself establish the performance of the complete barrier.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.
Product guidance to discuss at the survey