BKC is Mumbai's planned office district. Its blocks are new, square and built for fit-out. A glass partition job here is less about the building and more about the process. Who approves the work, when the freight lift is free, and how the partition line meets the ceiling grid.
Fitting glass around a BKC fit-out process
Nothing goes into a BKC office floor without the building's say. The facility team usually wants drawings, a list of workers and a work permit before we start. Some buildings ask for the fire safety plan to be checked too.
We prepare those papers while the glass is being made. Then the approval and the glass are ready together, and neither waits for the other.
Ask your building manager what they need and give it to us at the measuring visit. The glass is the quick part of a BKC job. The paper is what usually slows it.
Meeting rooms that stay quiet on an open floor
Most BKC floors are open plan with glass meeting rooms along one side. The question we are asked most is whether the room will be quiet enough for a call.
Single toughened glass cuts sound a little. Double glazing, two panes with a sealed gap, cuts it much more. The door matters as much as the glass. A door with a drop seal at the bottom keeps the room quiet. A door with a gap under it does not.
We usually suggest double glazing for the meeting rooms and single glass for the cabins. It depends on how your floor is used.
Panels sized to the ceiling grid and the freight lift
A BKC floor has a false ceiling on a grid, with lights and air vents in it. The partition line has to meet the grid where a tile edge falls, or the ceiling has to be cut.
We set the line to the grid at the measuring visit. That saves cutting tiles and keeps the air vents where they are.
The freight lift in these towers is usually large enough for a full-height panel. We still check the car and the door, and book the lift for the delivery. A booked lift means the panels come up in one trip and nobody stands in the lobby waiting.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.