Balewadi's office blocks are new, and many of their floors are still bare shell. A company takes a floor near Balewadi High Street or on Sus Road and fits it out from nothing. The glass partitions go in before the desks, the carpet and the ceiling tiles. That is the easiest time to build cabins. The floor is empty, the lift is in building mode and nobody is working beside us. We plan the whole floor as one job.
Fitting out a bare floor in a Balewadi block
On a bare floor we set out every cabin with a chalk line before anything is cut. You walk the lines with us. A cabin that looks right on a plan can feel small when you stand inside its outline. Moving a chalk line costs nothing. Moving glass costs a panel.
Once the lines are agreed, the floor channels go down and the ceiling channels go up. The glass follows a few days later, once it is made.
We work with your electrician and your ceiling contractor. The partition heads have to meet the ceiling grid, and the cabin lights have to land inside the cabins. A quick meeting on the floor saves a week of changes.
Meeting rooms along the glass line
The new blocks in Balewadi have glass on the outside. The meeting rooms usually go against that outer glass, so the people inside have a view and the room has daylight.
A meeting room on the glass line needs its inner wall to be glass too, or the floor behind it goes dark. We make that inner wall clear, with a frosted band at seat height. The room is private where people sit and open above and below.
For sound, the meeting room gets thicker glass than the cabins, and a door with a drop seal. The outer glass of the building is already thick. The weak point is always the inner wall and the door, so that is where we spend.
Why one order for the whole Balewadi floor costs less
A floor fitted out as one job carries one delivery, one lift booking and one visit from the team. Ten cabins ordered one at a time over a year carry ten of each, for the same glass.
On a new block in Balewadi the building's lift is in fit-out mode for a limited time. After that, moving glass means booking the passenger lift after hours. Doing the whole floor while the lift is free avoids that.
We show the price as separate lines for glass, fittings and labour. So you can see what a second cabin adds and what it does not. Usually it adds glass and fittings, and very little labour.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.