An office floor in the Rajiv Gandhi Infotech Park is not like a floor in the city. It is large, it is open, and it usually stands on a raised access floor with the cables underneath. The tenant holds a lease and may move to another block in Phase 2 or Phase 3 when it ends. Glass partitions in Hinjewadi have to answer all three. How they fix to the floor, how they divide an open plan, and whether they can come down and move.
Fixing glass partitions onto a raised floor in Hinjewadi
A raised access floor is tiles sitting on pedestals, with a void under them for cables. You cannot just screw a partition channel into a floor tile. The tile flexes and the partition rocks.
So we lift the tiles along the partition line and fix the channel through to the slab, or to a steel bearer set between pedestals. The tiles are cut around it and put back. The partition stands on something solid.
We coordinate with your IT contractor, because the cables under that line may need moving first. It is one more reason to plan the partition lines early, before the floor is cabled.
Huddle rooms and phone pods on an open IT floor
The open floors of Hinjewadi are loud with calls. What teams ask for most is not cabins for managers. It is small rooms for two to four people, and single pods for a call.
A huddle room is a glass box with a door, thicker glass for sound, and a frosted band so a call does not feel watched. A phone pod is smaller still, often with a solid back and a glass front.
We build them as free-standing boxes on the open floor, fixed to the ceiling grid and the slab. They do not need a wall to lean on. A floor can gain six of them without losing its openness.
Partitions that come down when the lease ends
A company in Hinjewadi may move blocks in a few years. Glass partitions bolted and siliconed in place are left behind, and the landlord may ask for the floor to be returned bare.
So we offer a demountable system. The glass sits in a frame that is clipped, not glued. The frames fix to the floor and ceiling with bolts that come out. At the end of the lease, the partitions come down in a day and go up again on the next floor.
It costs a little more at the start. It saves the whole cost of a second fit-out. For a tenant on a lease, that is usually the right sum.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.




