A glass partition in a Chinchwad factory does a different job from one in an IT office. It puts a supervisor in view of the shop floor. It keeps an inspection room clean while machines run outside it. It gives a front office near the gate a place to meet a buyer. The plants around Chinchwad Station and towards Bijlinagar need all three. Each one is glass, but the glass and the frame are chosen for the floor.
A supervisor's cabin overlooking a Chinchwad shop floor
A supervisor needs to see the line and to hear less of it. A glass cabin on the shop floor, raised a step or on a mezzanine, does both.
The glass is thick, for sound and for safety near moving machines and forklifts. The lower part of the cabin is often solid, with glass from desk height up. That keeps a trolley from putting a wheel through the glass and still gives the view.
The frame is heavier than an office frame, usually aluminium or powder-coated steel, bolted to the floor slab. A cabin that rattles every time a press comes down is a cabin that fails.
An inspection room that keeps the dust out
An inspection or quality room on a Chinchwad factory floor has to be cleaner than the floor around it. Dust from grinding, machining and the road settles on everything else.
So the partition is sealed. Glass to the ceiling or to a solid head, gaskets at every joint, a door with seals on all four sides and a closer that shuts it every time. The room holds a slight positive pressure from its own air supply, and the dust stays outside.
We build the glass side. We coordinate with your air-conditioning contractor on the ceiling and the supply, so the room is sealed as one.
A front office near the gate for buyers and visitors
A plant in Thergaon or near Chinchwad Station often has a front office near the gate. Buyers come there and do not go onto the floor. The office wants to look finished, and it wants to be quiet.
We build the meeting room and the manager's cabin in clear glass with a frosted band, like a city office. The glass is thick enough that the floor outside is a hum, not a noise.
The front office is usually fitted on a Sunday when the plant is down. The glass comes through the gate on the works lorry and we are done before the Monday shift.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.




