Fort is the old business heart of Mumbai. The offices of Ballard Estate and the streets behind Kala Ghoda sit in stone buildings with very high ceilings and heavy timber doors. Nariman Point adds office towers with flat slabs and service lifts. A glass partition in Fort has to respect the building it goes into. In the old blocks that means fixing to the floor and never to a carved wall.
Building a cabin without touching a heritage wall
The stone offices of Fort and Ballard Estate are protected. Anything fixed to an outside wall, a window surround or a carved feature may need permission. Many buildings refuse it. So we design the partition to stand without the wall.
The glass sits in a floor channel and a head channel. The head channel fixes to a false ceiling frame or to a free-standing post, not to the stone. At the wall end we use a slim post with a soft gasket. It touches the wall and does not drill it.
This keeps the building office happy, and it means the partition can be removed later without a mark. We show you this detail on the survey drawing before any glass is ordered.
Ceiling height in Ballard Estate offices
Rooms in Ballard Estate often have ceilings far above a normal office. A glass panel to the full height would be very tall, very heavy and very expensive. It would also carry nothing extra for privacy or sound.
So we usually run the glass to a fixed height and finish with a top panel. The top panel can be more glass in a frame or a painted board. Where the room has a cornice to show, we leave the gap open.
Where the office already has a false ceiling, we fix to its frame and check that the frame can carry the head channel. Many old ceilings here cannot. Then we add posts, and the glass carries its own weight to the floor.
Carrying glass up an old Fort staircase
Very few of the stone buildings in Fort have a service lift. Some have an old passenger lift that will not take a long panel. So most glass goes up the stairs by hand.
Fort staircases are wide and stone, which helps. But they turn at each landing, and the landing sets the longest panel that fits. We measure that landing on the survey, not on delivery day.
When a panel is too long for the turn, we split the run into two panels with a slim joint. Nariman Point towers are easier. They have service lifts, and the building sets a time window. We book it and bring the panels in one trip.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.