Pradhikaran is the planned part of Nigdi. Its sectors are laid out on a grid, and many of its plots carry a house built by the family that lives in it. Each bathroom in such a house was decided by the owner, not by a builder, so no two are alike. Across in Akurdi and Yamuna Nagar, the flats are older and some have a shower area set a step lower than the floor. We fit glass to both, and we measure every one as if it were the first.
Bathrooms on every floor of an owner-built Pradhikaran house
A house in the Pradhikaran sectors often has three floors and a bathroom on each. The ground floor one was built first, the top floor one years later when a floor was added. They differ in size, in tile and in where the shower is.
We measure each bathroom and plan each enclosure to its room. The glass and the hardware are the same across the house, so they match. The sizes are not.
A house has its own stair and no lift, but the stairs in these houses are wide and straight. Carrying a tall panel up is simple. The van parks at the gate on a lane wide enough for two cars.
A step-down shower area in an Akurdi flat
Some older flats in Akurdi and Yamuna Nagar have a shower area set a step lower than the rest of the bathroom floor. The step was meant to hold the water. It mostly collects it.
We set the glass on the edge of the step. The channel fixes to the step's riser or sits on its top edge. The glass then rises from the step, and the water stays in the lower area where the drain is.
The step's edge has to be sound for the channel to hold. We check it with a tap of the hand. If the tile is loose, it is re-set before the glass goes on.
Why Nigdi's planned lanes make the fitting day simple
The sectors of Pradhikaran were laid out before the houses came. The lanes are wide, the corners are square and the plot has a gate the van can back up to.
That sounds like a small thing. It is the difference between carrying a tall panel from the end of the lane and lifting it straight from the van to the door. The glass arrives in better shape and the fitting starts on time.
We still ask that the gate and the drive are clear on the morning of the fitting. The glass is the heaviest thing we carry and the walk should be as short as the sector allows.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















