Undri is being built. Row houses in Pisoli and Mohammadwadi, towers along NIBM Annexe, and roads that are still being laid between them. The homes are new and their bathrooms are being fitted for the first time. A row house has a bathroom on each floor and wants them to match. A tower flat has a bathroom that opens straight into the bedroom. Both change how we plan the glass.
Matching bathrooms on two floors of an Undri row house
A row house in Undri usually has a bathroom upstairs and one downstairs. Owners want them to look the same. Same glass, same fittings, same height. We measure both and quote them as one job.
The rooms are rarely identical. The upstairs bathroom often sits under a sloped ceiling or beside a terrace door. So the glass is cut to each room, but the style and the hardware match.
The glass arrives together and we fit both in a day. Upstairs first, so we are not carrying panels past a finished enclosure downstairs. The row house has its own stair and gate, so there is no lift to book and no society hour to keep.
A bathroom door that opens into the bedroom
In the Undri towers, the master bathroom opens into the bedroom. There is often a wooden or laminate floor on the bedroom side. Water that gets out of the shower goes straight onto it.
So the enclosure has to hold the water. We fit a lip seal at the floor and a good seal along the door edge. The door opens inwards where the shower is wide enough, so a dripping door drips inside the enclosure.
Where the shower is too narrow for an inward door, a sliding door keeps the drips inside too. A door that swings out over the bathroom floor is the one we avoid in these flats.
Fitting glass while the rest of Undri is still being built
Construction dust is everywhere in Undri. It settles on the glass the moment it is unwrapped and it gets into the hinges while they are being fitted.
So we keep the panels wrapped until the last minute. We fit the hardware, then clean the glass once with a proper glass cleaner before we leave. We tell you to leave the bathroom window closed for a day while the silicone cures, so dust does not stick to it.
If your flat is being painted at the same time, the glass goes in after the painter has finished. Paint spray on new glass is a long job to remove and an easy one to avoid.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















