Vikhroli has two kinds of home. The colony buildings of Kannamwar Nagar and Vikhroli East, with small bathrooms built to one plan. And the towers of Vikhroli West, where many flats are rented. A shower enclosure in a rented flat has to be removable. One in a colony bathroom has to fit a room with little space to spare. Both are ordinary Mumbai work for us.
An enclosure a tenant can take out later
Many flats in the Vikhroli West towers are rented. A tenant who wants a shower enclosure also wants to leave without a dispute about the walls.
So we fit a framed enclosure that comes out cleanly. The frame is fixed with a few screws into the grout lines where possible, not into the middle of tiles. The holes are small and easy to fill.
When the tenant leaves, the enclosure unscrews, the holes are filled, and the bathroom is as it was. The glass and frame can be refitted in the next flat if the sizes are close. We say which fixings we used, so the next person knows.
Compact enclosures for Kannamwar Nagar bathrooms
The colony flats of Kannamwar Nagar were built to one plan, and the bathrooms are small. The shower, the WC and the basin share a few square feet.
A single fixed panel with a walk-in gap is usually the right answer. No door, no swing space, and the WC side stays dry. Where the family wants the shower closed, a sliding door on a short track fits without taking any floor.
These buildings have stairs and no lift. The glass is carried up, and the stair turn sets the panel size. We measure it on the first visit.
Glass around the tiled ledge in the shower wall
Many Vikhroli bathrooms have a tiled ledge or a soap niche built into the shower wall at waist height. The glass line often crosses it.
A fixed panel that meets a ledge is notched to sit over it. Or it stops at the ledge, and the ledge becomes the end of the glass. Both are cut before toughening, so the ledge is measured exactly.
Where a door would hit the ledge when it swings, the hinge side is changed or the door becomes a slider. We check for ledges, niches and pipes at the measuring visit, since toughened glass cannot be cut on site.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















