Rabale MIDC is changing. Some plots still run factories. Others have been converted into office buildings that keep the old shed's bones. In both, the ceiling is high, often with trusses showing. A glass partition cannot run up to a ceiling like that. So in Rabale we build cabins that stand on their own, with a header that finishes them. We also plan for the heat and dust the shed brings.
A cabin that does not reach the ceiling in a Rabale shed
Under a tall shed ceiling, a partition that runs to the roof is not possible. The trusses are too high and too far apart to fix to.
So we build the cabin as a free-standing box. Glass panels in a frame with a steel header beam across the top. The header ties the panels together and carries the door frame.
The cabin gets its own ceiling, a dropped panel ceiling at normal height. The lights and the air conditioning sit in it. From inside, it feels like a normal room. From the shed floor, it is a glass box with a lid.
Converted plots, and the office buildings inside old sheds
Several Rabale plots now hold office floors built inside the old industrial shell. The floors are new, but the outer walls and roof are the shed's.
These floors need meeting rooms, cabins and a reception like any office. The difference is the heat. A metal roof heats the floor below it, and glass rooms under it get warm.
So we suggest tinted or coated glass on the sunward side and leave a gap above each cabin's ceiling so warm air escapes. We also put the air conditioning return above the cabin, not inside it.
Dust, deliveries and the plant's working week
A shed floor makes dust even when the plant is clean. We fit every cabin sealed, with a door closer and a drop seal, so the dust stays outside and the cooled air inside.
Glass is delivered through the plant's goods entrance, with the security office told in advance. The MIDC roads are wide and a van can stand, but the plant's own gate hours decide the delivery time.
Fitting is done on the plant's weekly off day where there is one, or at the weekend. A working plant does not stop for a glass cabin, and it should not have to.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.




