The Steel Market in Kalamboli is rows of godowns full of steel bars, coils and sheets. Each has an office, usually a glass cabin near the gate where the owner sits and the drivers come for papers. Building glass inside a steel godown has its own rules. Where the crane runs. What happens when a bar drops. How hot a tin roof gets. We build for all three.
Placing a cabin clear of the crane in a Kalamboli godown
Most steel godowns run an overhead crane or a gantry along the length of the shed. A glass cabin must sit outside its path, and outside the swing of a load.
We walk the godown with you and mark the crane's reach on the floor. The cabin goes in the dead zone near the gate, where the drivers come anyway.
The cabin faces the loading bay through glass, so you see the trucks and the weighing. The back and the side towards the stock are solid panel to desk height, glass above.
Glass that survives a dropped bar
Steel being moved in a godown sometimes falls. The bang shakes the floor and anything near it.
So the glass in a Kalamboli cabin is laminated, two layers bonded with a film. If it is struck, it cracks and holds in place rather than falling in pieces. Toughened glass alone would shatter into the office.
The frame is fixed to a concrete plinth, not to the godown floor plates, which move when loads land. The plinth also lifts the office above the water that runs across godown floors in the monsoon.
Heat, iron dust and a cabin that stays cool
A steel godown with a metal roof is hot from mid-morning. The air carries fine iron dust that settles on everything and rusts where it lands.
We seal the cabin fully. Gaskets on every joint, a door closer and a drop seal. The air conditioning then cools the cabin and not the godown, and the dust stays on the godown side of the glass.
The cabin's frame is powder-coated aluminium, which the iron dust does not mark. Bare steel sections would show rust streaks within one monsoon.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.




