Prepare a clear brief for your gym
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Plan the mirror wall around movement and equipment
Provide the wall dimensions and mark sockets, pillars and anything fixed to the surface. Identify the activity in front of the mirror and the position of nearby equipment. This lets the survey consider panel layout, supports and the distance between the finished surface and moving objects.
The wall should be assessed before panels are ordered. The chosen fixing method must suit the wall and mirror backing. Ask about suitable adhesive, support, edge protection and ventilation. A mirror wall is not established as an impact-resistant or structural barrier simply by making the glass thicker.
Separate mirror work from doors and changing rooms
List damaged mirror panels, entrance faults and shower problems as separate items. For a slamming door, note scraping or latching problems too. For a shower leak, identify whether water appears at the door gap or a wall joint. Each observation helps the fitter select the inspection rather than assume a replacement part.
Keep members away until the area is handed back
Agree which stations will be closed and where equipment will stand during work. Confirm any waiting time for adhesives or sealants before the space is used. Check mirror alignment, door movement and the agreed leak test with the fitter. Record the supplied materials and instructions for future cleaning and replacement.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.
Product guidance to discuss at the survey