Prepare a clear brief for your hotel
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Make a room-by-room repair schedule
List each room or public area, the affected item and the reported fault. Distinguish a cracked panel, loose hinge, leaking shower and a door that will not latch. Similar-looking rooms may contain different fittings after earlier repairs, so compatibility must be checked rather than assumed across a whole floor.
Agree room availability with the hotel contact. Confirm the route for materials and removed glass, access to occupied corridors, and who authorizes entry to a room. Plan noisy work and cleaning with operations rather than promise a time from the property's name.
Specify the replacement before ordering a room batch
For shower glass, agree dimensions, door swing, holes, seals and hardware. Toughened panels cannot be resized after processing. For mirrors, assess the wall and suitable backing and fixings. Fire doors, controlled access and specialist glazing need their own requirements confirmed before ordinary repairs are accepted.
Release each room after its own checks
Operate repaired fittings and agree the leak test or curing interval where relevant. Use the room schedule to record completion and outstanding work separately. Keep the itemized product and part details so maintenance staff know what was installed and how to care for it.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.
Product guidance to discuss at the survey