Prepare a clear brief for your school
Use this checklist for your own premises. Access rules, installed products and approvals need confirmation at the site.
Identify the opening and who uses it
State whether the request concerns a classroom window, staff-office partition, entrance door or washroom. Note reachable handles, moving leaves and adjacent circulation space. The intended use and the school's requirements must be considered before a glass or hardware specification is agreed.
Ask the school to define the permitted work period and separation from pupils. Confirm the route for materials and removal, the responsible site contact and how rooms will remain locked or supervised while the work is unfinished. Do not treat a weekend date as automatic access permission.
Assess repairs without assuming a universal part
For a window that will not close, record whether movement, the handle or the latch is at fault. The survey distinguishes adjustment from damaged hardware or a frame problem. Glass in a door, barrier or specialist assembly needs the required specification checked; visual similarity does not establish the correct replacement.
Return the room through the school's responsible person
Agree which opening, locking and finish checks will be recorded. Account for removed glass and parts, and identify any curing time before use. The school should confirm its access and operational requirements are satisfied before pupils return to the affected space.
Compare a complete scope, not just a starting rate
The catalogue shows starting prices in each service's unit. A per-piece rate and a per-square-foot rate describe different quantities. Ask the quote to state the measured quantity, material specification, fittings, finish, labour and GST separately. Identify removal, disposal, access equipment and making-good work explicitly.
For repairs, ask which existing parts will remain and which will be changed. For new glass, agree dimensions, holes, cut-outs, edge finish and hardware positions before production. If the scope changes after the visit, obtain the revised price before the additional work starts.
Check the finished work before handover
Operate the repaired door or window with the fitter present. Check movement, latching, handle operation and the finish around replaced parts. For a shower or sealing repair, agree the appropriate leak check and any curing time before use. Do not assume that a visual inspection proves a performance rating.
Keep the itemized invoice, the named product or fitting and the care instructions. Record any remaining work and the contact for follow-up. Do not attempt to adjust heavy glass panels or replace unfamiliar hardware yourself if the movement changes after fitting.