Every tower along Ghodbunder Road has a row of shops at its base. Clinics, salons, cafes and offices open onto the highway service road from Kavesar to Kolshet. Our partition work here is mostly a glass front for one of those shops, and the cabins inside it. The highway brings dust and rain to the glass.
A glass front for a shop under a Ghodbunder Road tower
The shop units under these towers come as a bare opening with a shutter. The glass front is what turns it into a shop.
We fit a frame of aluminium inside the opening, behind the shutter line. Fixed toughened glass fills most of it. A glass door, hinged or sliding, sits where you want the entry. The shutter still comes down at night over everything.
The frame is set so the shutter guides stay free. We measure the opening with the shutter down and up, because the two are not always the same size.
Cabins inside a clinic or salon on the service road
A clinic on Ghodbunder Road needs a consulting room that is private. A salon needs cubicles that are not. Both are glass partitions, built differently.
For the clinic we use frosted glass or a full frosted film and a door with a soft close. Sound matters, so the partition goes up to the ceiling and the door gets seals.
For the salon we use clear glass with a low frosted band. It divides the space and keeps it bright. The glass is toughened in both cases and sits in a slim frame that cleans easily.
Highway dust and driving rain on a shop front
The service road along the highway carries dust all day. In the monsoon the rain blows straight at the shop fronts on the western side.
Dust sits on the glass and in the door track. We fit a brush seal on the door and a cover on the track. The glass itself is easy to wipe. A water-repellent coating helps the rain run off.
The base of the front is sealed to the floor with outdoor silicone. Drain gaps in the bottom channel let any water that gets behind the glass run out again.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.




