Kasarvadavali and Owale are the newest end of Thane's Ghodbunder belt. The townships here hand over flats with a master bathroom and a common one. The two rooms are different sizes and are used differently. In Kasarvadavali we usually fit a different kind of glass in each.
A full cubicle for the master, a fixed panel for the common bathroom
The master bathroom in these township flats is the larger room. It takes a proper enclosure, with a door and a dry floor outside it.
The common bathroom is smaller and is used by guests and children. A single fixed panel of toughened glass often serves it better. It keeps the spray off the basin and WC and leaves the floor open.
We measure both rooms on one visit. Both sets of glass are ordered together. The two are fitted on the same day, with one lift booking.
Silicone cure time in the humid Thane air
A new enclosure is sealed with silicone along every join. Silicone sets by taking moisture from the air, but it needs the surface itself to be dry.
In Kasarvadavali the air is humid for much of the year. The seal takes longer to firm up than it would in a dry city. We ask you not to use the shower for a day after fitting.
In the monsoon we may ask for a little longer. Running the exhaust fan speeds it up. A seal that is wetted too soon can lift at the edge later.
Fitting glass before painting is finished
Many flats in Owale and Anand Nagar are still being painted when the owner wants the bathroom done. The order matters.
We can fit the glass before the final coat, but the painter must not lean a ladder on it. Fresh paint splashes on glass wipe off with water when still wet. Dry paint has to be scraped, and that can mark the glass.
So we cover the enclosure after fitting and ask that it stays covered until the painter leaves. The cover comes off on the day you move in.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















