The towers of Manpada and Dhokali are new, and many flats are being finished for the first time. The shower partition is one of many jobs happening at once. Painters, electricians and a false-ceiling team are all in the same bathroom. In Manpada our job is to fit the glass at the right moment among them.
Where the shower glass fits in the interior sequence
A new flat on Kolshet Road usually gets a false ceiling, new lights and a geyser before the owner moves in. Sometimes new tiles too. The shower glass should come near the end of that list.
The false ceiling sets the final height of the room. A tall panel is cut to the ceiling it will meet. The geyser and its pipes set where the wet wall is.
We visit once early to agree the layout with your interior contractor. We measure for the glass once the ceiling and tiles are done. The glass then goes in with no clash.
Compact new bathrooms and the hinged door that fits
Bathrooms in these new towers are compact and square. A hinged door enclosure suits them well, but the swing has to be planned.
We set the door to open outward into the room. We check it clears the WC, the basin and the bathroom door. A door that opens inward would hit the shower tap.
Where two walls meet at the shower corner, a two-sided enclosure with one door is the usual shape. The glass is clear toughened glass. Frosted glass is used only on the panel facing the bathroom door, if you want it.
Working in a tower that is still being finished
A tower in Manpada with many flats under interior work has a busy service lift. Material for several flats goes up and down all day.
We book a lift slot through your society office or the site team. Glass panels are carried standing, wrapped and padded. We do not leave glass in a common passage.
Once fitted, the enclosure is covered with a sheet until the painting is over. Paint and cement dust scratch new glass when wiped off dry. We tell your contractor how to clean it.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.