The towers on Pokhran Road No 2 and around Cadbury Junction have bathrooms of two kinds. Some are long and narrow, with the shower at the far end. Some are wide, with room to walk in. In Majiwada we pick the shower glass to suit which kind you have.
A sliding shower door for a long narrow bathroom
In a narrow bathroom a hinged shower door swings into the path to the WC or basin. It bangs the tap or the door frame.
A sliding door solves that. Two glass panels run in a top track. One slides behind the other, so nothing swings out. The opening is half the width of the enclosure, which is enough for most people.
Sliding doors need a straight, level top rail. We check the walls are parallel on the first visit. Where they are not, the track is set to the glass and the small difference is taken up in the frame.
Walk-in glass for a wide Majiwada tower bathroom
A wide bathroom can take a walk-in shower. That is one fixed panel of tall toughened glass with no door at all.
The panel stands between the shower and the rest of the room. You walk around its open end. There is no door to clean, no hinge to rust, and no seal to replace.
It only works where the open end is far enough from the spray. We measure how far the water reaches from your shower head. A short return panel at the open end stops most splash where the room is a little too short.
Hot water, geyser position and the glass
In many Majiwada flats the geyser is mounted on the shower wall itself. The glass has to clear it, and the pipes below it.
We plan the fixed panel so the geyser stays on the wet side and can still be serviced. Where the geyser sits where the glass should go, we suggest a layout that moves the glass, not the geyser. Moving plumbing costs more than moving a panel.
Steam from hot water rises and settles on the glass. A water-repellent coating keeps the panel clearer, and the fan should face the wet side.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















