The towers of Majiwada have glass balcony railings, wide sliding doors and large windows. Each has small metal parts that wear long before the glass does. In Majiwada, Thane, we replace those parts. We only suggest new glass or a new frame when the old one has really failed.
A glass balcony railing that has gone loose
A glass railing is held by clamps or a base channel. Over time the rubber inside the clamp hardens and the bolts work loose. The panel then moves when you lean on it.
This is a safety job, not a cosmetic one. We tighten or replace each clamp, fit new rubber gaskets and check every bolt into the slab. Where a clamp has rusted through, it is replaced with stainless steel.
We test the panel by hand once done. A railing panel that still moves after that is taken out and refitted on a new channel.
Sliding balcony doors on a Majiwada tower floor
The wide sliding door to a tower balcony is heavy glass on small rollers. Years of use flatten the rollers and the door drags on the track.
We lift the panel out, fit new rollers of the right load rating and clean the track. The lock is reset so it catches again. The door then moves with one hand.
High floors face strong wind in the monsoon. We check the drain holes in the sill while the panel is out. Blocked holes are why water appears inside after heavy rain.
Broken glass in a tower window or door
A cracked pane on an upper floor has to be made safe before it is replaced. Toughened glass that has broken sits as a sheet of small pieces that can fall.
We tape and board the opening on the first visit. We measure the frame and order new toughened glass to that size. On the second visit we fit it and re-seal the frame.
For a balcony railing panel the new glass is toughened, and sometimes laminated. Laminated glass holds together when it breaks. We suggest it where a child plays on the balcony.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.























































