A bathroom in an Old Panvel house is unlike one in a New Panvel flat. The old one has pipes running along the wall, a step up at the door and walls that lean a little. The new one has straight walls and hidden plumbing. We fit shower glass in both. The old house needs more thought at the measuring visit, and that is where the job is decided.
Fitting glass around exposed pipes in an Old Panvel house
The pipes in an old bathroom run on the surface of the wall, not inside it. A glass panel cannot pass through a pipe, and toughened glass cannot be notched.
So we set the panel line clear of the pipes. Or we use a frame with a channel that stops at the pipe and starts again beyond it. The gap is sealed around the pipe.
If a pipe sits exactly where the only sensible panel line falls, a plumber moves it first. It is a small job. We tell you at the measuring visit so it is done before the glass is made.
Walls that lean, and the frame that straightens the view
Old houses in Panvel have settled over the years. A wall that looks straight is often out by a finger's width over the height of a door.
Frameless glass set against a leaning wall shows a wedge-shaped gap. A slim aluminium frame hides that lean inside its channel and seals the gap.
We put a level on every wall. Where they lean, we suggest the frame and say why. Where the bathroom has been rebuilt with new tiles, frameless is usually fine.
New Panvel and Khanda Colony flats
The flats in New Panvel and Khanda Colony are modern. The plumbing is in the wall, the floor is level and the walls are square.
Most people choose frameless glass here. A hinged door where there is room to swing, a sliding door where there is not. Stainless steel fittings in both.
The lift takes a full panel in the newer towers. In the lower blocks we measure the stairs and make two panels where one will not pass the turn.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















