Ulwe is being built around the people who already live there. Towers are handed over while the next one rises beside them. Construction dust is in the air every day. For a shower enclosure that changes two things. When we fit it, so other trades do not damage it. And how we protect the glass and the seal until the flat and the sector settle down.
Fitting order in a flat that is still being finished
An Ulwe flat often comes with tiling done and nothing else. The owner then has painting, wardrobes and electrical work ahead.
The shower glass goes in after the tiling and the flooring are final and after the wet trades are finished. Plaster splashes and paint on new glass are hard to remove, and a grinder near it leaves pits that never polish out.
So we measure early and fit late. The glass is made and waits with us until your other trades are done. Then it goes in and nobody works near it again.
Protecting new glass and silicone from Ulwe's dust
Dust in the air settles on wet silicone and sets into it. The seal looks dirty from day one and never cleans.
So on fitting day we ask you to keep the bathroom window and door shut while the silicone cures, a full day at least. We leave a protective film on the glass. It peels off when the flat is finished.
If building work carries on next door for months, we fit a coated glass that lets dust rinse off. Rinse first, then wipe. Wiping dry grit scratches.
Measuring before you move in
Many Ulwe owners measure for the shower before they move in, while they still live elsewhere. That is the right order.
We meet you at the flat, check the walls with a level, mark the panel line against the drain's fall and take the sizes. The glass is then made while you finish the rest of the flat.
Fitting is booked for a day after your other trades have left. One visit to measure, one to fit, and no glass standing in a flat full of workers in between.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















