The towers of Worli Sea Face stand right at the water. Flats on their upper floors have large bathrooms, often with a window to the sea. Wind at that height pushes damp salt air through any open window. Off Annie Besant Road the blocks are older and the bathrooms smaller. We fit shower glass across Worli, and we size and specify it for how high and how close to the sea you are.
A walk-in shower in a Worli Sea Face tower
A sea-facing tower bathroom usually has room for a walk-in shower. Frameless toughened glass suits it: a fixed panel, a hinged door, and small hinges on the glass. Low-iron glass keeps the view clear without a green edge.
The walls in these towers are straight, so frameless sits well. We still check with a level. A tower that has stood through many monsoons may have moved a little, and the tile layer may not be true.
For the door we use a hinge that lifts the door as it opens and lowers it as it closes. The door seals itself against the fixed panel. In a bathroom this size the door is the part you touch every day, so it should feel right.
Wind and salt on an upper floor
High up on the Worli Sea Face the wind is strong for much of the year. A bathroom window left open lets it blow straight across the shower. Salt comes with it and dries on the fittings.
We use marine-grade stainless steel hinges, clamps and handles. We advise against plated fittings even if they match a tap finish. We can match a black or a brushed finish in stainless steel instead.
The door closing matters too. A shower door left open in that wind can swing hard. We fit a hinge with a soft hold at the open position, so it stays where you leave it. A small detail that saves a glass edge from a wall.
Smaller bathrooms in the older blocks off Annie Besant Road
The older blocks between Annie Besant Road and Haji Ali have smaller bathrooms than the towers. The shower is often a corner of a wet room with one drain.
We suggest a sliding shower door on a fixed panel for these. It needs no floor to swing. Or a single fixed screen, if the room is very tight. We check where the floor falls before we place the glass, so water runs to the drain and not out under the door.
These blocks have small lifts. A tall panel goes up the stairs, and we measure the turn at the survey. The society usually sets hours for work. We book the carry and the drilling inside them.
How the job works
- Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
- We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
- We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
- You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
- We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.















