A flat you have just been handed, and what order to do things in.

620/ sq ft starting price

Before GST. Firm price after we measure your site.

  • Building access handled
  • 2-year product warranty, 6 months on the work
  • Professional site manager on every job
Shower Cubicles - Noida Extension

Get prices for this work

Tell us where to reach you - it takes 30 seconds.

Free to ask. Your details are protected and stay confidential. We use them to price your job and nothing else.

Taking possession of a new flat produces a long list and no obvious order, and people frequently do things in a sequence that makes later items harder or more expensive. The shower enclosure has a natural place in that order, and it is worth knowing where it sits before starting anything.

What belongs before the enclosure

Anything that disturbs the bathroom walls or floor comes first: retiling if you are doing it, moving plumbing, and any work on the waterproofing.\n\nSo does the electrical work for a geyser, an extractor or a mirror light, because that means chasing walls.\n\nThe enclosure goes after all of it, because glass fitted before those trades gets damaged and the silicone joint gets disturbed. Where the bathroom is staying as handed over, none of this applies and the enclosure can go in straight away.

What belongs after it

Very little. Painting should be finished, the sanitaryware installed and the mirror fixed before we come.\n\nThe enclosure is genuinely one of the last things in a bathroom, which is why it is worth booking the survey early even if the fitting is weeks away.\n\nGlass has a lead time once ordered, so the useful sequence is: survey early, decide the layout, order when the bathroom is nearly finished, fit last. People commonly call us at the end, which puts a week's wait after everything else is done.

The rest of the flat, in a sensible order

Across the whole flat the same logic applies: anything that chases a wall or disturbs a floor first, then finishes, then glass and mesh last.\n\nSo grilles and mesh, which fix into masonry, come before painting; the enclosure comes after tiling.\n\nIt is worth writing the list in that order rather than by urgency. Most of the avoidable expense in fitting out a new flat comes from doing something that then has to be lifted, disturbed or protected while something else happens.

How the job works

  1. Tell us about the jobSend a few photos, rough sizes and what you need. Use WhatsApp or the form. For a repair, a short video of the door moving helps a lot.
  2. We call you back in about 2 minutesWe confirm what you need and a time to visit. Where we can, we give you a rough price on the call.
  3. We come and measureWe measure the opening and check the walls, floor and ceiling around it. Anything made to size is made to these measurements, so they must be right.
  4. You get a written priceIt lists each item, with GST as its own line. If anything about the job changes, we tell you before we go ahead.
  5. We fit itYou approve the price and pay the advance. Our own team fits the work, checks that every door and window opens and closes properly, and clears up. Most jobs are done in 3 to 4 days.

Common questions

We have just taken possession in Noida Extension. When does the enclosure go in?

Last in the bathroom — after any retiling, plumbing, waterproofing and electrical chasing, and after painting and sanitaryware. Where the bathroom is staying as handed over, none of that applies and it can go in straight away.

When should we book the survey?

Early, even if fitting is weeks away, because glass has a lead time once ordered. The useful sequence is survey early, decide the layout, order when the bathroom is nearly finished, fit last. Calling at the end adds a week of waiting.

What order should the rest of the flat go in?

Anything that chases a wall or disturbs a floor first, then finishes, then glass and mesh last. So grilles and mesh before painting, enclosure after tiling. Most avoidable expense comes from doing something that then has to be disturbed.

Shower Cubicles styles

More we fit and repair in Noida Extension

Related pages

Shower Cubicles in Noida Extension

Send the size and a photo. Every size is verified on site, you get a firm written price, and asking costs nothing.

Shower Cubicles - Noida Extension

Get prices for this work

Tell us where to reach you - it takes 30 seconds.

Free to ask. Your details are protected and stay confidential. We use them to price your job and nothing else.

  • Certified toughened safety glass. It stays safe even if it ever breaks.
  • Genuine branded fittings
  • We buy authentic materials from reputable, established suppliers.
  • We check the quality before we leave. Most jobs are done in 3 to 4 days.
  • No hidden fees. GST is shown as its own line on the quote.
  • Your details stay protected and confidential on a secure connection.
  • You get dedicated support after fitting, from the same team every time. They are dependable.
  • Easy and transparent from the first message. We work customer-first, so the job stays hassle-free.
Shower Cubicles - Noida Extension

Get prices for this work

Tell us where to reach you - it takes 30 seconds.

Free to ask. Your details are protected and stay confidential. We use them to price your job and nothing else.

Chat on WhatsApp